Answer

Through all aspects of this project we are keeping the environment at the forefront of our discussions.

We have consulted numerous experts and are following the strictest requirements in the country to ensure there are minimal impacts on the environment.

A significant portion of the ESR examined the treatment of effluent discharge into the West Credit River. The report focused on selecting the most suitable effluent outfall location. Subsequent to the detailed analysis of two separate locations, Winston Churchill Blvd. was selected as the preferred location to reduce potential impacts on brook trout and to utilize higher flows for greater dilution of effluent, despite higher construction costs.

Learn more about the Environment Assessment and Environment Study Report here.